📷 Image: Wikimedia Commons / Raybellrich
Science
Indian Railways achieves breakthrough in 6.59‑km Uttarakhand tunnel
✍️ News On AIR
🗓 27 Nov 2026, 09:21 PM
👁 31
Indian Railways has successfully completed the breakthrough of a 6.59‑kilometre tunnel in Uttarakhand, marking a key milestone in the project.
Indian Railways announced that excavation on a 6.59‑kilometre tunnel in Uttarakhand has reached the breakthrough stage, indicating that the two ends of the tunnel have met. The achievement is a notable engineering milestone for the rail network in the Himalayan state, where rugged terrain has traditionally hampered large‑scale infrastructure work. Officials noted that the tunnel will improve connectivity and cut travel time once the broader railway line is completed, although details of the line and its schedule were not disclosed. The breakthrough was accomplished using conventional drilling and blasting methods, with strict safety and environmental protocols observed throughout the project. The railway authority now intends to proceed with tunnel lining, installation of systems and subsequent testing before the tunnel is opened for commercial train operations.