🔥 TRENDING 51वीं नर्मदा पंचकोशी यात्रा आज से ममले... India Grants Japan Access to Firing Ra... New Zealand Leads 317-6 at Lunch on Da... India Drops Ravindra Jadeja Ahead of 1... New Zealand at 317-6, Phillips Out for... Tahira Kashyap’s ‘Star Wife’ Joke Goes...
20 Nov 2026•
ગુજરાતી मराठी ਪੰਜਾਬੀ বাংলা
Panel Reviews 130-Year-Old Mullaperiyar Dam for Structural Integrity
📷 Image: Hindustan Times (via NewsData)
National

Panel Reviews 130-Year-Old Mullaperiyar Dam for Structural Integrity

✍️ Hindustan Times 🗓 02 Sep 2026, 03:41 PM 👁 207
Share: 💬 WhatsApp 📘 Facebook 𝕏 Post

A panel led by former NHPC chief Balraj Joshi inspected the Mullaperiyar dam and its surrounding area near Vallakadavu, Kumily, to evaluate its structural soundness.

A panel headed by former National Hydro Electric Power Corporation chief Balraj Joshi visited the Mullaperiyar dam and its premises at Vallakadavu near Kumily.

The primary objective of the visit was to assess the structural integrity of the 130‑year‑old dam, which has been a subject of concern for several years.

During the inspection, the team examined the dam’s concrete face, spillways, and associated infrastructure for signs of wear or potential failure.

The panel will compile its findings into a report that will be forwarded to state authorities for further action.
📲Get App